Monday, September 26, 2011

New 100kW Turbine Dedicated Sunday near Random Lake

from an article in The Sounder, September 22, 2011

An open house and dedication will be part of Sunday’s program to dedicate the 100-kilowatt wind turbine on the Preder farm west of Random Lake. The wind turbine was erected jointly by the Jeff and Kathy Preder family, and the Ed and Stephenie Ritger family, who are neighbors living on County Rd. I.
Sunday’s open house from 1-4 p.m. will have exhibits about renewable energy, tower inspections, farm tours and light refreshments. Among the exhibitors will be the Lakeshore Technical College wind energy program and the Random Lake High School Science Club. The 2 p.m. dedication ceremony will include a talk about the theology of environmental stewardship by Fr. Ed Eschweiler. Among his writings is the prayer, “Beatitudes for Stewards of Earth,” and the book, “Celebrating God’s Good Earth in Prayer, Discussion & Action.”
There will be comments by elected officials, including Cong. Tom Petri (R-Fond du Lac) and State Rep. Dan LeMahieu (R-Cascade). Northern Power Systems of Barre, Vermont, will give a jobs report. Visitors can park at the Preder Farm, N254 County Rd. I, west of Random Lake.
The turbine is expected to produce all the electrical power needed to run the Preder household and the farming operation with enough electricity left over to power 12 to 15 additional homes. That additional power will be sold to the We Energies utility.

0 comments:

Post a Comment

Twitter Delicious Facebook Digg Stumbleupon Favorites More

 
Design by Free WordPress Themes | Bloggerized by Lasantha - Premium Blogger Themes | Top WordPress Themes